TK 12000

Course Fee TK 10000

Course Name: HOUSE WIRING AND INDUSTRIAL CONTROLLING

Class
Class Topic
01COMMERTIAL NAME OF HOUSE WIRING MATERIALS AND THEIR SELECTION.
02HOUSE WIRING PRACTICAL PRACTICE.
03TOTAL LOAD CALCULATION PROCEDURE OF A BUILDING.
04HOUSE WIRING CABLE SPECIFICATION AND SELECTION.
05INTRODUCTION TO PUSH BUTTON/SWITCHES/ROTARY SWITCHES ETC.
06INTRODUCTION AND UNDERSTANDING OF SWITCHING CONTACTS- NO/NC TYPES.
07GARMENTS MULTISTORIED BUILDING, FIRE ALARM CIRCUIT INSTALLATION DIAGRAM PRACTICAL PRACTICE.
08SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC CONTACTOR.
09THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC CONTACTOR.
10SPECIFICATION, AMPERE SELECTION & CONNECTION PROCEDURE OF SAFETY THERMAL OVERLOAD FOR MOTOR.
11THREE PHASE MOTOR PROTECTION CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING THERMAL OVERLOAD.
12INDUSTRIAL DOL (DIRECT ON LINE) SWITCH PREPARING & CONNECTION PROCEDURE.
13SPECIFICATION, SELECTION & CONNECTION PROCEDURE OF 3 PH INDUCTION MOTOR.
14MOTOR CHECKING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER.
15STAR AND DELTA CONNECTION PHYSICAL PRACTICE.
16SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC RELAY.
17LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC RELAY.
18THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING RELAY & MAGNETIC CONTACTOR.
19INTRODUCTION TO PHASE FAILURE RELAY.
20INDUSTRIAL THREE PHASE FAILURE RELAY PREPARING & CONNECTION PROCEDURE.
21MOTOR PROTECTION CIRCUIT PRACTICAL PRACTICE BY USING PHASE FAILURE RELAY.
22SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF ON DELAY TIMER.
23LOAD CONTROL CIRCUIT PRACTICAL PRACTICE BY USING ON DELAY TIMER.
24THREE PHASE MOTOR CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING RELAY, ON DELAY TIMER & MAGNETIC CONTACTOR.
25FUNCTION AND CONNECTION PROCEDURE OF OFF DELAY TIMER.
26THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING OFF DELAY TIMER & MAGNETIC CONTACTOR.
27CONNECTION AND SETTING PROCEDURE OF TWIN/SEQUENTIAL TIMER.
28NAME AND SELECTION PROCEDURE OF VARIOUS INDUSTRIAL METERS.
29MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER.
30MEASURING PROCEDURE PRACTICAL PRACTICE BY USING CLAMP ON METER.
31MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MEGGER TESTER
32CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG VOLTMETER.
33CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL VOLTMETER WITH PROGRAMMING.
34CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG AMMETER.
35CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL AMMETER WITH PROGRAMMING.
36TRAFFIC SIGNAL CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING SEQUENTIAL TIMER
37 LOAD (TWO MINUTE ON & 30 SECOND REST) CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING TIMER.
38AUTO WATER LEVEL CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR MULTI-STOREYED BUILDING/ INDUSTRY.
39MANUAL CHANGE OVER SWITCH CONNECTION PROCEDURE PRACTICAL PRACTICE FOR SUPPLYING DUEL POWER OF A MULTI STORED BUILDING.
40AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITHOUT TIMER FOR GENERATOR & REB.
41AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITH TIMER TO PROTECT REB FROM HUNTING CURRENT (FOR GENERATOR AND REB).
42BUS BAR COPPER CALCULATION PROCEDURE AND PRACTICAL PRACTICE AS PER VARIATION OF LOAD.
43SAFETY PANEL SWITCHING CONTROL BY USING LIMIT SENSOR OF POWER PLANT.
44MODERN PROXIMITY (2 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTIC.
45MODERN PROXIMITY (3 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTICE.
46PHOTO SENSOR (5 WIRE) CIRCUIT PRACTICAL PRACTICE FOR LIFT.
47MANUAL FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR THREE PHASE MOTOR.
48AUTO FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE USING TIMER FOR THREE PHASE MOTOR.
49STAR DELTA 3 PHASE EASY CONNECTION PROCEDURE FROM MOTOR.
50STAR DELTA 3 PHASE EASY CONNECTION PROCEDURE FROM MOTOR.
51THREE PHASE MOTOR CONNECTION PROCEDURE USING STAR DELTA CONTROL CIRCUIT PRACTICAL PRACTICE.
52ELECTRICAL TROUBLE SHOOTING PRACTICAL PRACTICE FROM INDUSTRIAL PANEL BOARD.
53MPCB (MOTOR PROTECTION CIRCUIT BREAKER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
54MMS (MANUAL MOTOR STARTER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
55INDUSTRIAL CABLE SELECTION AND CHECKING PROCEDURE.
56SINGLE LINE DIAGRAM PRACTICE FOR SUB STATION
57BENEFIT OF USING POWER FACTOR FOR INDUSTRY.
58ECONOMY POWER FACTOR IMPROVEMENT CAPACITOR SELECTION PROCEDURE.
59P.F.I (POWER FACTOR IMPROVEMENT PLANT) CONTROL RELAY SELECTION, CONTROLLING AND CONNECTION & PRACTICAL PRACTICE.
60P.F.I CONTROLLER PROGRAMMING & PARAMETER SELECTION.
61FAMILIARIZATION WITH INDUSTRIAL DIODE, LED, ZENER DIODE, CHECKING AND PRACTICAL PRACTICE.
62INTRODUCTION TO INDUCTOR, CAPACITOR & RESISTOR.
63TC (THERMOCOUPLE) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
64TEMPERATURE CONTROLLER CONNECTION PROCEDURE PRACTICAL PRACTICE WITH PROGRAMMING AND TROUBLE SHOOTING.

Call Us

01927-279281
01703-980538
01726-716343
01855-877015

Email

meitc1277@gmail.com

Offices

DUET 2nd Campus Rd 1700 Gazipur, Dhaka Division, Bangladesh

Leave a Reply

Your email address will not be published. Required fields are marked *