TK 12000
Course Fee TK 10000
Course Name: HOUSE WIRING AND INDUSTRIAL CONTROLLING
Class | Class Topic |
---|---|
01 | COMMERTIAL NAME OF HOUSE WIRING MATERIALS AND THEIR SELECTION. |
02 | HOUSE WIRING PRACTICAL PRACTICE. |
03 | TOTAL LOAD CALCULATION PROCEDURE OF A BUILDING. |
04 | HOUSE WIRING CABLE SPECIFICATION AND SELECTION. |
05 | INTRODUCTION TO PUSH BUTTON/SWITCHES/ROTARY SWITCHES ETC. |
06 | INTRODUCTION AND UNDERSTANDING OF SWITCHING CONTACTS- NO/NC TYPES. |
07 | GARMENTS MULTISTORIED BUILDING, FIRE ALARM CIRCUIT INSTALLATION DIAGRAM PRACTICAL PRACTICE. |
08 | SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC CONTACTOR. |
09 | THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC CONTACTOR. |
10 | SPECIFICATION, AMPERE SELECTION & CONNECTION PROCEDURE OF SAFETY THERMAL OVERLOAD FOR MOTOR. |
11 | THREE PHASE MOTOR PROTECTION CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING THERMAL OVERLOAD. |
12 | INDUSTRIAL DOL (DIRECT ON LINE) SWITCH PREPARING & CONNECTION PROCEDURE. |
13 | SPECIFICATION, SELECTION & CONNECTION PROCEDURE OF 3 PH INDUCTION MOTOR. |
14 | MOTOR CHECKING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER. |
15 | STAR AND DELTA CONNECTION PHYSICAL PRACTICE. |
16 | SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC RELAY. |
17 | LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC RELAY. |
18 | THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING RELAY & MAGNETIC CONTACTOR. |
19 | INTRODUCTION TO PHASE FAILURE RELAY. |
20 | INDUSTRIAL THREE PHASE FAILURE RELAY PREPARING & CONNECTION PROCEDURE. |
21 | MOTOR PROTECTION CIRCUIT PRACTICAL PRACTICE BY USING PHASE FAILURE RELAY. |
22 | SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF ON DELAY TIMER. |
23 | LOAD CONTROL CIRCUIT PRACTICAL PRACTICE BY USING ON DELAY TIMER. |
24 | THREE PHASE MOTOR CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING RELAY, ON DELAY TIMER & MAGNETIC CONTACTOR. |
25 | FUNCTION AND CONNECTION PROCEDURE OF OFF DELAY TIMER. |
26 | THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING OFF DELAY TIMER & MAGNETIC CONTACTOR. |
27 | CONNECTION AND SETTING PROCEDURE OF TWIN/SEQUENTIAL TIMER. |
28 | NAME AND SELECTION PROCEDURE OF VARIOUS INDUSTRIAL METERS. |
29 | MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER. |
30 | MEASURING PROCEDURE PRACTICAL PRACTICE BY USING CLAMP ON METER. |
31 | MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MEGGER TESTER |
32 | CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG VOLTMETER. |
33 | CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL VOLTMETER WITH PROGRAMMING. |
34 | CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG AMMETER. |
35 | CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL AMMETER WITH PROGRAMMING. |
36 | TRAFFIC SIGNAL CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING SEQUENTIAL TIMER |
37 | LOAD (TWO MINUTE ON & 30 SECOND REST) CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING TIMER. |
38 | AUTO WATER LEVEL CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR MULTI-STOREYED BUILDING/ INDUSTRY. |
39 | MANUAL CHANGE OVER SWITCH CONNECTION PROCEDURE PRACTICAL PRACTICE FOR SUPPLYING DUEL POWER OF A MULTI STORED BUILDING. |
40 | AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITHOUT TIMER FOR GENERATOR & REB. |
41 | AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITH TIMER TO PROTECT REB FROM HUNTING CURRENT (FOR GENERATOR AND REB). |
42 | BUS BAR COPPER CALCULATION PROCEDURE AND PRACTICAL PRACTICE AS PER VARIATION OF LOAD. |
43 | SAFETY PANEL SWITCHING CONTROL BY USING LIMIT SENSOR OF POWER PLANT. |
44 | MODERN PROXIMITY (2 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTIC. |
45 | MODERN PROXIMITY (3 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTICE. |
46 | PHOTO SENSOR (5 WIRE) CIRCUIT PRACTICAL PRACTICE FOR LIFT. |
47 | MANUAL FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR THREE PHASE MOTOR. |
48 | AUTO FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE USING TIMER FOR THREE PHASE MOTOR. |
49 | STAR DELTA 3 PHASE EASY CONNECTION PROCEDURE FROM MOTOR. |
50 | STAR DELTA 3 PHASE EASY CONNECTION PROCEDURE FROM MOTOR. |
51 | THREE PHASE MOTOR CONNECTION PROCEDURE USING STAR DELTA CONTROL CIRCUIT PRACTICAL PRACTICE. |
52 | ELECTRICAL TROUBLE SHOOTING PRACTICAL PRACTICE FROM INDUSTRIAL PANEL BOARD. |
53 | MPCB (MOTOR PROTECTION CIRCUIT BREAKER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM. |
54 | MMS (MANUAL MOTOR STARTER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM. |
55 | INDUSTRIAL CABLE SELECTION AND CHECKING PROCEDURE. |
56 | SINGLE LINE DIAGRAM PRACTICE FOR SUB STATION |
57 | BENEFIT OF USING POWER FACTOR FOR INDUSTRY. |
58 | ECONOMY POWER FACTOR IMPROVEMENT CAPACITOR SELECTION PROCEDURE. |
59 | P.F.I (POWER FACTOR IMPROVEMENT PLANT) CONTROL RELAY SELECTION, CONTROLLING AND CONNECTION & PRACTICAL PRACTICE. |
60 | P.F.I CONTROLLER PROGRAMMING & PARAMETER SELECTION. |
61 | FAMILIARIZATION WITH INDUSTRIAL DIODE, LED, ZENER DIODE, CHECKING AND PRACTICAL PRACTICE. |
62 | INTRODUCTION TO INDUCTOR, CAPACITOR & RESISTOR. |
63 | TC (THERMOCOUPLE) HARDWARE DESCRIPTION & CONNECTION DIAGRAM. |
64 | TEMPERATURE CONTROLLER CONNECTION PROCEDURE PRACTICAL PRACTICE WITH PROGRAMMING AND TROUBLE SHOOTING. |
Call Us
01927-279281
01703-980538
01726-716343
01855-877015
meitc1277@gmail.com
Offices
DUET 2nd Campus Rd 1700 Gazipur, Dhaka Division, Bangladesh