DIPLOMA INDUSTRIAL ATTACHMENT COURSE CURRICULUM PROFESSIONAL BATCH

COURSE FEE: 12000 TAKA
CLASS 5 DAYS PER WEEK
PER CLASS DURATION: 3 HOURS

(A)DOMESTIC AND INDUSTRIAL AUTOMATION

 

  1. MULTISTORE BUILDING WIRING ELECTRICAL EQUIPMENT NAME, AND DESIGN DISPLAYING FROM PROJECTOR.
                                    
  2. NATIONAL BUILDING CODE RULES AND BUILDING WIRING PRACTICE BY USING CHANGE OVER AND PROTECTIVE CIRCUIT BREAKER.
  3. FRIDGE, AIR CONDITIONER, ELECTRIC OVEN, GEYSER CONTROL SWITCH CALCULATION, AND CONNECTION PRACTICE.
                                                                                           
  4. ESTIMATION RULES OF MULTISTORE BUILDING LOAD CALCULATION AND SELECTION OF CABLES.
  5. DOMESTIC CABLE DESIGN, SPECIFICATION, AND SELECTION PROCEDURE AS PER MULTI-STORED BUILDING REQUIREMENTS.
           
  6. INTRODUCTION TO INDUSTRIAL SWITCHES: PUSH BUTTON, SELECTOR, ROTARY, TOGGLE AUTO& MANUAL AND DISPLAYING FROM PROJECTOR. 
  7. OPERATING AND CONNECTION PROCEDURE OF SWITCHES DISPLAY FROM PROJECTOR.
  8. DISPLAYING FIRE ALARM EQUIPMENT FROM PROJECTOR AND PRACTICAL PRACTICE.
  9. INDUSTRIAL MOTOR CONTROL MAGNETIC CONTACTOR TYPE, CAPACITY SELECTION, AND INTERNAL WIRING DIAGRAM DISPLAYING FROM PROJECTOR.

  10. DIAGRAM PREPARATION AND 3-PHASE LOAD RUN PRACTICE FROM NO/NC PUSH AND MAGNETIC CONTACTOR.

  11. THEORY OF MOTOR PROTECTION SAFETY DEVICES, CAPACITY SELECTION, BRAND SELECTION, AND INTERNAL WIRING MEMORIZATION.

  12. DESIGNING, DRAWING, CONNECTION, AND PROTECTION LOAD TEST PERFORMANCE PRACTICE FROM PROJECTOR.

  13. ADVANTAGE, AVAILABILITY, PERFORMANC PRACTICE FROM DIRECT ONLINE SWITCH.
  14. SELECTION OF INDUSTRIAL INDUCTION MOTOR FOR INDUSTRY AS PER INSULATION CLASS, IP PROTECTION, SERVICE FACTOR, TYPE, AND FRAME SIZE REALIZATION.

  15. MOTOR CHECKING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER AND MEGGER TESTER.
  16. ADVANTAGES OF MOTOR STAR-DELTA CONNECTION AND STAR-DELTA CONNECTION PHYSICAL PRACTICE.


  17. ON DELAY TIMING RELAY INTRODUCTION, VOLTAGE SELECTION, TIMING SELECTION AND INTERNAL WIRING REALIZATION FOR MOTOR STAR DELTA RUN.

  18. INDUSTRIAL MOTOR DELAY CONTROL CIRCUIT PRACTICAL PRACTICE BY ON DELAY TIMER.
  19. INDUSTRIAL MAGNETIC RELAY TYPE, VOLTAGE, AND AMPERE SELECTION. INTERNAL WIRING IDENTIFICATION, AND SELECTION AS PER LOAD.

  20. MONITORING VARIOUS TYPES OF RELAY FROM PROJECTOR AND LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE.

  21. INDUSTRIAL AND DOMESTIC MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING RELAY & MAGNETIC CONTACTOR.

  22. WHAT IS PHASE DETECTION RELAY, COMMERCIAL TYPE OF PHASE DATE

  23. ECONOMY PHASE DETECTION CIRCUIT FABRICATION BY MAGNETIC RELAY.
  24. INDUSTRIAL MOTOR ECONOMY PROTECTION PRACTICAL PRACTICE BY PHASE-DETECTION CIRCUIT AND EASY REPAIRING PROCEDURE.
  25. BENEFITS AND APPLICATION OF DELAY OFF TIMING RELAY ON GENERATOR AND FURNACE BOILER IN INDUSTRY.

  26. PRACTICAL PRACTICE OF INDUSTRIAL MOTOR DELAY-OFF AND TROUBLESHOOTING.

  27. DUEL/SEQUENTIAL TIMER APPLICATION AND INTERNAL WIRING IDENTIFICATION WITH TIME SETTING PROCEDURE.
  28. AUTO CONTROL TRAFFIC SIGNAL PRACTICAL PRACTICE BY SEQUENTIAL TIMER

  29. FAMILIARIZATION WITH ELECTRICAL HAND TOOLS LIKE EARTH TESTER, MEGGER METER, PHASE SEQUENCE METER, POWER FACTOR METER, RPM MONITORING METER, MULTIMETER, CLAMP-ON METER, AVOMETER ETC.

  30. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING A MULTIMETER.

  31. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING CLAMP-ON METER.

  32. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MEGGER TESTER

  33. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG VOLTMETER.

  34. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL VOLTMETER WITH PROGRAMMING.

  35. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG AMMETER.

  36. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL AMMETER WITH PROGRAMMING.
  37. DOMESTIC WATER TANK AUTO-CONTROL BY ELECTRICAL FLOAT SENSOR PRACTICAL PRACTICE AND ECONOMY CONNECTION PROCEDURE.

  38. DOMESTIC AND INDUSTRIAL CHANGE OVER SWITCH FAMILIARIZATION AND MONITORING TYPES AVAILABLE IN THE LOCAL MARKET.
  39. DOMESTIC PUMP MOTOR CONTROL SWITCH TYPE AVAILABILITY IN LOCAL MARKET, PRICE COMPARISON AND CONNECTION PROCEDURE PRACTICE.
  40. AUTO TRANSFER SWITCH (ATS) BENEFITS, CONTROLLING PROCEDURE, AND PRACTICAL PRACTICE FOR GENERATOR & REB.

  41. HUNTING PREVENTION AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE AND PRACTICAL PRACTICE BY APPPLICATION WITH TIMER.

  42. DB PANEL MAKING PROCEDURE IN APPLICATION WITH COPPER AND ALUMINIUM BUS BAR, THUMBS RULE FOR CALCULATION AND PRACTICE WITH VARNIER CALIPER.

  43. POWER PLANT OPERATING PANEL OPERATION IN APPLICATION WITH VARIOUS TYPE LIMIT SENSOR.

  44. SUPER MARKET AND HIGH-RISE BUILDING METAL DETECTOR MAKING PROCEDURE BY APPLICATION OF PROXIMITY SENSOR

  45.  METAL DETECTOR CIRCUIT    PRACTICAL PRACTICE BY USING NPN AND PNP SENSOR.
  46. HIGH RISE MARKET/BUILDING LIFT CONTROLLING BY USING PHOTOELECTRIC SWITCH (TRANSMITTER AND RECEIVER) PRACTICAL PRACTICE.
  47. INDUSTRIAL MOTOR REVERSE /FORWARD CONNECTION PRACTICAL PRACTICE.
  48. INDUSTRIAL MOTOR AUTO FORWARD AND REVERSE CONNECTION PRACTICAL PRACTICE.
  49. LOAD SELECTION, ITEM SELECTION AS PER MOTOR CAPACITY, AND PRACTICE STAR-DELTA CONNECTION WITH 3 PHASE MOTOR.
  50. MODIFIED AND ECONOMY STAR DELTA CONNECTION FOR MOTOR PRACTICE WITHOUT TIMER.
  51. PROCEDURE OF FAULT-FINDING OF A PANEL BOARD.
  52. FAULT FINDING PRACTICE WITH LOADED CIRCUIT AND PANEL.
  53. MPCB (MOTOR PROTECTION CIRCUIT BREAKER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
  54. MMS (MANUAL MOTOR STARTER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
  55. CABLE CALCULATION AND SELECTION PROCEDURE FOR INDUSTRY AND POWER PLANT, REB, PDB, DESA, DESCO, FAMILIAR NAME IN MARKET, AND AMPERE SELECTION.
  56. WHY SINGLE A LINE DIAGRAM MANDATORY FOR SUBSTATION, LAYOUT PROCEDURE, AND PRACTICE
  57. LOSS AND BENEFIT FOR VARIATION OF POWER FACTOR IN INDUSTRY.
  58. ECONOMY POWER FACTOR IMPROVEMENT CAPACITOR SELECTION PROCEDURE.
  59. P.F.I (POWER FACTOR IMPROVEMENT PLANT) CONTROL RELAY SELECTION, CONTROLLING, AND CONNECTION PRACTICAL PRACTICE.
  60. P.F.I CONTROLLER PROGRAMMING & PARAMETER SELECTION.
  61. FAMILIARIZATION WITH SOLID-STATE RELAY, SCR, BRIDGE RECTIFIER, THERMOSTATE,
  62. LED, DIODE, ZENER DIODE, CAPACITOR, BREAKER, HRC FUSE, IC, VOLTAGE STABILISER IC ETC CHECKING PROCEDURE AND PRACTICAL PRACTICE.

    62. TC (THERMOCOUPLE) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
  63. TEMPERATURE CONTROLLER CONNECTION PROCEDURE PRACTICAL PRACTICE WITH PROGRAMMING AND TROUBLESHOOTING.

(B) VFD/ FREQUENCY INVERTER PROGRAMMING, CONNECTION, MOTOR RUN, TROUBLESHOOTING (5 BRANDS: SIEMENS, LS, MITSUBISHI, DELTA, SHIHLIN)

  1. INTRODUCTION TO VFD, TALK ABOUT ITS BENEFITS AND WHY WE SHOULD USE A VFD.
  2. VFD HARDWIRE SELECTION PROCEDURE ACCORDING TO LOAD/MOTOR.
  3. CONNECTION PROCEDURE OF A MOTOR TO A VFD DEVICE.
  4. FAMILIARIZATION WITH VFD INTERNAL AND EXTERNAL MODE
  5. VFD EXTERNAL MODE WIRING ACCORDING TO VFD COMPANY MANUAL PRACTICAL PRACTICE
  6. FAMILIARIZATION WITH VFD OPERATION MODE SELECTION FOLLOWING VFD MANUAL.
  7. INTRODUCTION TO VFD PARAMETER SETTING ACCORDING TO VFD MANUAL.
  8. FAMILIARIZATION WITH VFD FAULT FINDING AND TROUBLESHOOTING.

 

(C) PLC PROGRAMMING, CONNECTION & TROUBLESHOOTING (5 BRANDS: MITSUBISHI, SIEMENS, LS, OMRON, DELTA)

 

  1. INTRODUCTION TO PLC.
  2. DISCUSS ABOUT PLC INPUT ELEMENT
  3. DISCUSS ABOUT PLC OUTPUT ELEMENT
  4. DISCUSS ABOUT PLC INPUT MODULE / OUTPUT MODULE
  5. DISCUSS ABOUT PLC ADDRESSING.
  6. FAMILIARIZATION WITH VARIOUS PLC LANGUAGES
  7. BLOCK DIAGRAM OF PLC.
  8. FAMILIARIZATION WITH VARIOUS LADDER SYMBOL
  9. CONCEPT AND CONVERSION FROM ELECTRICAL DIAGRAM TO LADDER DIAGRAM
  10. BASIC CONCEPT OF PLC SOFTWARE & DATA CABLE
  11. OVERVIEW AND INSTALLATION OF VARIOUS PLC SOFTWARES
  12. LOAD CONTROLLING WITHOUT LATCHING PRACTICAL PRACTICE
  13. LOAD CONTROLLING WITH LATCHING PRACTICAL PRACTICE
  14. FAMILIARIZATION WITH INTERNAL AUXILIARY RELAY IN PLC
  15. COMPARISON BETWEEN GENERAL AUXILIARY RELAY AND BATTERY BACKED AUXILIARY RELAY
  16. FAMILIARIZATION WITH DIFFERENT TYPE OF INTERNAL TIMERS IN PLC.
  17. COUNTING SYSTEM AND LOGIC OF INTERNAL ON DELAY TIMERS IN PLC.
  18. DIFFERENCE BETWEEN NORMAL TIMERS AND RETENTIVE TIMERS.
  19. ON DELAY TIMER LOGIC PRACTICAL PRACTICE
  20. DESIGN OF A COMPLICATED PROJECT USING MULTIPLE TIMERS AS PER REQUIREMENT.
  21. DESIGN A TRAFFIC SIGNAL PROJECT USING MULTIPLE TIMERS.
  22. FAMILIARIZATION WITH VARIOUS TYPE OF COUNTERS IN PLC.
  23. LOAD CONTROLLING PRACTICAL PRACTICE USING COUNTERS
  24. STAR-DELTA CIRCUIT PRACTICAL PRACTICE IN PLC.
  25. FAMILIARIZATION WITH VARIOUS TYPES OF DATA REGISTERS IN PLC.
  26. PROGRAMMING OF DATA REGISTERS COMBINED WITH INCREMENT, DECREMENT & DATA REGISTERS
  27. TIMER COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
  28. COUNTERS COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
  29. FAMILIARIZATION WITH COMPARE COMMAND IN PLC.
  30. LOAD CONTROLLING USING COMPARE COMMAND PRACTICAL PRACTICE.
  31. INTRODUCTION TO “MOV “CO
  32. PROGRAMMING PRACTICE USING MOV COMMAND.
  33. PRACTICAL PROJECTS DESIGNING PRACTICE FOLLOWING CLIENTS’ REQUIREMENTS.
  34. PLC HARDWARE CONNECTION PRACTICAL PRACTICE.
  35. EDITING/READING AND COPYING LADDER FROM PLC USING USB CABLE PRACTICAL PRACTICE.
  36. WRITING AND TRANSFERRING LADDER LOGIC TO PLC USING USB CABLE PRACTICAL PRACTICE.
  37. PLC TROUBLESHOOTING PROCEDURE WITH LOAD.
  38. PLC ONLINE MONITORING AND TROUBLE SHOOTING PRACTICAL PRACTICE.

(D)HUMAN MACHINE INTERFACE (HMI) PROGRAMMING, CONNECTION & LOAD CONTROLLING

  1. INTRODUCTION TO HMI – UNDERSTANDING WIRING & INSTALLATION
  2. INTRODUCTION TO VARIOUS TYPES OF SWITCHES (MOMENTARY, MAINTAINED, SET, RESET ETC.)
  3. INTRODUCTION TO HMI DISPLAY ELEMENTS.
  4. INTRODUCTION TO NUMERIC DISPLAY FOR DISPLAYING NUMBER, COUNTS OR PRODUCTION & LOAD CONTROLLING PRACTICAL PRACTICE.
  5. LOAD CONTROLLING AND TIMER DISPLAY DESIGN IN HMI PRACTICAL PRACTICE.
  6. INTRODUCTION TO NUMERIC ENTRY FOR GIVING THE INPUT FROM HMI & LOAD CONTROLLING PRACTICAL PRACTICE.
  7. LOAD CONTROLLING AND CHANGING TIME DURATION BY USING NUMERIC ENTRY DESIGN PRACTICAL PRACTICE.
  8. INTRODUCTION TO MOVING SIGN & PRACTICAL IMPLEMENTATION
  9. DATA TRANSFER PROCESS & TROUBLESHOOTING FROM PC/LAPTOP.